Effluent Produced Waste Water (YOGYAKARTA)
Tanggal
01 Nop 2021-04 Nop 2021
29 Nop 2021-02 Des 2021
Tempat
Yogyakarta (Jogjakarta plaza hotel/Ibis hotel yogyakarta/Ibis Styles yogyakarta hotel/Mutiara hotel/ Melia Purosani hotel)
TRAINING DURATION : 4 days
INTRODUCTION:
Produced water is the largest single fluid stream in exploration and production operations. It consists of formation water, or flood water previously injected in to the formation. Generally, produced water may be injected with minimal treatment. If the injected water contains solids large enough to plug the formation, injectivity will decline. Downhole solids contributing to plugging may include not only the solids escaping filtration, but solids generated after water treatment (eg corrosion, scale, and bacterial products). Consequently, stringent corrosion inhibition, scale inhibition and bacterial control, as well as filtration, may be required for matrix rate injection. The course content and approach are designed to suit participants of different background and different position in the company. It will be delivered as a to-the-point explanation by a professional instructor, utilizing an easy-to-understand examples and illustrations, especially the actual cases in Indonesia.
WHAT WILL YOU LEARN FROM THIS TRAINING?:
By attending this course, participants are able to broaden or reshape their knowledge on the related subjects of his or her area of responsibility, learn more detail about many aspects of produced water handling and reinjection, know more how to treat the water and control corrosion, scaling, and bacterial action, understand how to select and use chemicals for treatment and operation of each equipment used for treatment, discuss and consult their specific problems they are about to bring to the class, and share experiences with others. After completion of this course, participants will understand what produced water is and its fantastic devastating potential to surface facility, well, and formation, how to predict and monitor its characteristics, why and how to perform treatment before reinjection, and how to control and prevent these big and serious problems caused by produced water in the oil & gas field. Participants will know what the minimum requirements for produced water before reinjection and what to do to achieve that requirements.
TRAINING MATERIAL OUTLINE:
- Understand produced water chemistry
- The suspended oil, dissolved oil and dissolved gases
- Bacteriological matter and added materials
- Suspended solid removal
- Suspended oil removal
- Chemical treating for control of bacteria
- Chemical treating for the control of scale
- Corrosion control techniques and the use of biocides
- Corrosion and bacterial problems
- Mineral scale formation
- Equipment and pipeline plugging
- Injection well and formation plugging
- The method and operation of produced water treatment for reinjection
- For either surface operation engineers or subsurface petroleum engineers, and anyone who involve in produced water handling, treatment, and related business activity.
INVESTMENT PRICE/PERSON :
- Rp. 8.500.000/person (full fare) or
- Rp. 8.250.000/person (early bird, payment 1 week before training) or
- Rp. 7.950.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS:
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)
TRAINING INSTRUCTOR
Ir. M. Syahri, MT, Ph.D is alumnus from UPN “Veteran” Yogyakarta (UPNYK) and Institute of Technology (ITB) department of Chemical Engineering. Also alumnus from University Kebangsaan Malaysia (UKM) department Mechanical and Material Engineering. He has been as researcher at Oil and Gas; Renewable Energy Laboratory UPNYK, he is also being as Senior Surface Facility Engineer in some project and Training Instructor. Some projects have been handled by him such as Senior Surface Facility Engineer, Plant of Development TAC Ramba-Pertamina Field, Sumbagsel (2008); Plant of Further Development East Pamanukan Field, Pertamina DOH Cirebon – Rainbow Emerald (2007); Plant of Further Development Nglobo Field, Pertamina DOH JBT – Cepu (2005); Plant of Further Development Ketaling Barat Field, Pertamina DOH Sumbagteng – Jambi (2005); Also as Reviewer Team BP MIGAS, East Kalimantan Gas Deliverability (Vico, Chevron, TOTAL) (2007). He also gave many courses to the companies, such as: Basic Ammonia Storage, Transfer Equipment and Major Hazards Impact; Dehydration Process (Oil and Gas Operation); Clean Water Processing & Treatment for Industrial Application; Principle of Chemical Process Industry for non Engineer; Boiler Feed Water Treatment & Trouble shooting; Hazarous Materials Safe Handling; Basic Principle For steam Reformer, Shift Reaction, Operability Problem & trouble shooting; CO2 Removal Technology (Absorber, Striper) Trouble shooting and Operability impact; Catalitic Reactor in Ammonia Industry (Desulfurizer, Methanator, Steam Reformer, Ammonia Converter); Basic Fundamental Ammonia Synthesis, ARU And Process in Middle End Area; Inspection of Insulated Pipes Defects and Repairs Techniques; Emergency Handling in Ammonia Industry; etc.